Traffic Hackers

Two traffic engineers in Los Angeles hacked into a traffic light control system with the intent to influence upcoming contract negotiations.

1 minute read

November 8, 2008, 11:00 AM PST

By Tim Halbur


"Gabriel Murillo, 39, and Kartik Patel, 36, who worked with the city's Automated Traffic Surveillance Center, each pleaded guilty to a single felony count of illegally accessing a city computer connected to the center.

The illegal access occurred hours before a job action in August 2006 by members of the Engineers and Architects Assn., which represents the engineers who run and maintain the city's traffic center. It took four days to get the traffic control system fully operational afterward and underscored the vulnerability of L.A.'s the complex system.

The breach, reported on Aug. 21, 2006 between 9:10 and 9:30 p.m., involved sending computer commands that disconnected four signal control boxes at critical intersections: Sky Way and World Way at LAX; Coldwater Canyon Avenue and Riverside Drive in the San Fernando Valley; Alvarado Street and Glendale Boulevard at Berkeley Avenue in Echo Park; and 1st and Alameda streets downtown."

Thursday, November 6, 2008 in Los Angeles Times

Young Professional

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban and Environmental Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban and Environmental Planner

Get top-rated, practical training for planners

"Planetizen federal action tracker" logo superimposed over black and white image of US Capitol dome.

Planetizen Federal Action Tracker

A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

October 14, 2026 - Zachary Whalen

Cars driving under automatic congestion pricing toll machines on Broadway next to the Trump International Hotel in Manhattan, New York City.

Data reveals that NYC’s bet on congestion pricing has paid off

After almost two years of the program, reports show positive impacts on traffic and air quality and no disruptions to parking.

October 13, 2026 - Marcelo Remond

A crane lifts a manufactured house, with is rectangular and does not yet have a roof.

HUD modernizes 50-year-old manufactured housing framework

The Next Generation Manufactured Housing Action Plan establishes new energy-efficiency standards for manufactured homes, and new guidelines for anchoring them.

October 8, 2026 - Boston Real Estate Times

construction workers on the roof of a house.

California voters weigh $11.25 billion housing bond

Prop. 1, combined with other funding, would support over 40,000 new rental units in California.

October 18 - Cal Matters

MIRA President Tom Kirk gestures at the opening ceremony of the solar array at the Hartford Landfill. There are rows of solar panels behind him.

Connecticut is turning landfills into green infrastructure

Twenty-nine solar arrays have been built, or approved to be built, on top of Connecticut landfills.

October 18 - The CT Mirror

Sheep in a field stand next to solar panels.

Trump guts ‘win-win’ solar energy program for rural farmers

The U.S. Department of Agriculture’s changes have made virtually all solar power ineligible for funding through the Rural Energy for America Program.

October 18 - Grist