Bertha

Another, Final(?) Delay for Alaskan Way Viaduct Replacement
The Washington Department of Transportation announced that Seattle's Alaskan Way Viaduct will close permanently in January 2019, with service switching over the tunnel Bertha built. The previous plan expected the switch to occur in the Fall.

Bertha Finally Breaks On Through (To the Other Side)
The Bertha tunnel boring machine was once stuck under the city of Seattle for more than a year. Now it has reached its goal, four years after it began its journey.

Bertha Effect: Tunnel Project Delayed Until 2019, Plus $223 Million in Overruns
The chickens have come home to roost in Seattle, where the state has tallied up the cost and time overruns for the Highway 99 tunnel project.
A Drill Not Named Bertha Got Stuck in Seattle
A drill named Pamela, tasked with digging the tunnel for the Sound Transit light rail extension from Husky Stadium to Northgate, was stuck in the dirt under Seattle for several months.

Bertha Stuck Again: Sinkhole Prompts Suspension of Highway 99 Tunnel Project
The adventure of Bertha the tunnel-boring machine, already two years behind schedule, has a new twist.

Bertha Awakens—New Hope After a Two-Year Delay for Seattle Tunnel-Boring Machine
Baby steps are an improvement for the tunnel-boring machine known as Bertha. The drill moved a total of 1.5 feet this week, but the symbolic distance probably felt like a mile.
Gov. Christie Hired to Try Reverse Psychology on Bertha Tunnel-Boring Machine
With the Bertha tunneling-boring machine stuck in the mud under Seattle for more than a year, officials turned to a politician known for his ability to stop transportation in its tracks.
Bertha on the Move Again in Seattle
Finally, a breakthrough we've all been waiting for: Bertha is on the move again in Seattle and will soon be ready for repairs. The tunnel Bertha was built to drill will have to wait, however.

How Seattle's 'Rose-tinted Fantasy' Threw Billions in Public Money Away
"Seattle is in the midst of a full-spectrum transportation fustercluck," writes David Roberts for Grist.
Forget Sunk Cost—What's the Best Way to Spend Bertha's Remaining Funds?
Seattle’s massive highway tunneling project delays while solutions are sought for the mechanical error that brought the project’s massive drilling machine, Bertha, to a halt. Some are starting to examine life after Bertha.
With Bertha Stuck in the Mud, Officials Question Contractor Conduct
Though Seattle's giant tunneling machine remains stuck 60 feet under South Main Street, muck is starting to be flung above the surface. An email from Washington's Transportation Secretary reveals concerns over the conduct of the machine's operators.

What's Blocking Seattle's Tunnel-Boring Behemoth?
Is it a giant rock? What about a sunken ship? Beneath Seattle's waterfront, a mysterious object has halted Bertha, the world's largest tunnel-boring machine. Stumped engineers are unclear on how long a highway tunneling project will be suspended.
Urban Design for Planners 1: Software Tools
This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.
Planning for Universal Design
Learn the tools for implementing Universal Design in planning regulations.
Economic & Planning Systems, Inc.
UCLA Lewis Center for Regional Policy Studies
Mpact (formerly Rail~Volution)
Chaddick Institute at DePaul University
City of Piedmont, CA
Great Falls Development Authority, Inc.
HUDs Office of Policy Development and Research