Construction on the Brooklyn-Queens Streetcar, a potential legacy project for New York Mayor Bill de Blasio, was supposed to begin in 2019. The fate of the heavily debated project will rest with the next mayor.

"A 16-mile streetcar line along the East River in Brooklyn and Queens was going to be one of Mayor Bill de Blasio's signature projects, expanding transportation access to neighborhoods like Red Hook that are relatively far from the subway," writes Dan Rivoli.
But with the original expected construction date already well past, Mayor de Blasio has conceded that the fate of the Brooklyn-Queens Connector will rest with the city's next mayor, who will be elected in 2021.
"The project has faced mounting challenges, including questions about de Blasio's plan to pay for it with tax revenues from new development along the line. Three years ago, he downsized the plan to 11 miles, but raised the cost and called for federal financing," explains Rivoli of the numerous roadblocks the streetcar was navigating before the pandemic. Since the pandemic, the project has ground to a halt.
NY1 reached out to nine Democratic candidates for mayor, finding just one, Loree Sutton, who vowed to build the streetcar. Sutton has since dropped out of the race.
FULL STORY: Brooklyn-Queens Streetcar Is in Hands of Next Mayor, But No Democrat Running Fully Embraces It

Study: Maui’s Plan to Convert Vacation Rentals to Long-Term Housing Could Cause Nearly $1 Billion Economic Loss
The plan would reduce visitor accommodation by 25,% resulting in 1,900 jobs lost.

Placekeeping: Setting a New Precedent for City Planners
How a preservation-based approach to redevelopment and urban design can prevent displacement and honor legacy communities.

Using Old Oil and Gas Wells for Green Energy Storage
Penn State researchers have found that repurposing abandoned oil and gas wells for geothermal-assisted compressed-air energy storage can boost efficiency, reduce environmental risks, and support clean energy and job transitions.

Washington State Plans Ambitious ‘Cycle Highway’ Network
The state is directing funding to close gaps in its existing bike network and make long-distance trips more accessible.

Homeowners Blame PG&E for Delays in ADU Permits
The utility says it has dramatically reduced its backlog, but applicants say they still face months-long delays for approvals for new electrical work.

Rethinking Wildfire Defense: How a Landscape Approach Can Protect Neighborhoods
Post-fire analysis of the Eaton Fire reveals that a landscape approach — including fire-resistant vegetation, home hardening, and strategic planning — can help reduce wildfire risk, challenging assumptions that trees and plants are primary fire hazards.
Urban Design for Planners 1: Software Tools
This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.
Planning for Universal Design
Learn the tools for implementing Universal Design in planning regulations.
Borough of Carlisle
Caltrans
Heyer Gruel & Associates PA
Institute for Housing and Urban Development Studies (IHS)
City of Grandview
Harvard GSD Executive Education
Salt Lake City
NYU Wagner Graduate School of Public Service
City of Cambridge, Maryland