Revised Plans for Massive 'Ike Dike' Plan Revealed

A $26.2 billion proposal to protect the coastal area around Galveston has evolved since its first iteration in 2018.

2 minute read

October 29, 2020, 7:00 AM PDT

By James Brasuell @CasualBrasuell


Coastal Resilience

U.S. Army Corps of Engineers/Texas General Land Office / Coastal Texas Study

"The Army Corps of Engineers has released the second draft of proposed coastal barrier that would fundamentally alter the southeast Texas coastline, with massive sea gates across the Houston Ship Channel and 43 miles of dunes and renourished beaches spanning Bolivar Peninsula and Galveston," reports Nick Powell.

The Army Corps of Engineers selected a final version of the plan from four alternatives almost exactly two years ago. The project is designed to protect the coast of Texas in and around Galveston from a storm surge like the one that hit the area during Hurricane Ike in 2008. Among the big components of the project is a gate across the mouth of Galveston Bay and the Houston Ship Channel, according to Powell. "The gate would remain open year-round and would only be closed when a storm-surge event threatens the Texas coast or for annual maintenance checks and inspections," explains Powell. A ring levee protecting the north side of Galveston Island would also be connected to the Galveston Seawall.

The project, formerly referred to as the "Ike Dike," has undergone significant changes since its previous version: The gate would restrict tidal flow from the bay to the Gulf of Mexico by 10 percent rather than the originally proposed 27 percent. The price has also been lowered from an estimated $32 billion to the new cost of $26.2 billion, reports Powell. Since October 2018, the plan has also overcome some of the local opposition, on environmental grounds, to the plan after a series of hurricanes passed near the area this year alone and as the plan has been revised.

Now the plan will begin a public engagement process that will last until December 14. To help present the plan to the public, the Army Corps of Engineers has released interactive web features including 3-D virtual tours.

Tuesday, October 27, 2020 in Houston Chronicle

portrait of professional woman

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban Planner

Get top-rated, practical training

Concrete Brutalism building with slanted walls and light visible through an atrium.

What ‘The Brutalist’ Teaches Us About Modern Cities

How architecture and urban landscapes reflect the trauma and dysfunction of the post-war experience.

February 28, 2025 - Justin Hollander

Complete Street

‘Complete Streets’ Webpage Deleted in Federal Purge

Basic resources and information on building bike lanes and sidewalks, formerly housed on the government’s Complete Streets website, are now gone.

February 27, 2025 - Streetsblog USA

Close-up on mortgage application terms and house-shaped gold keychain with gold key on it.

HUD Cuts Could Derail Mortgage Underwriting Agency

Staffing cuts at the Federal Housing Administration could imperil affordable housing projects and mortgage programs for new homeowners.

February 25, 2025 - Bloomberg CityLab

Black and white photos of couple walking on Great Highway road in San Francisco on the water during the pandemic when the road was closed to vehicular traffic.

Part of San Francisco Waterfront Highway to Become Pedestrian-Only in April

Two miles of the ‘Great Highway’ will be permanently closed to cars, in part due to erosion that makes the road unsafe for vehicles.

47 minutes ago - Streetsblog San Francisco

Water purification plant in El Paso, Texas on riverfront.

El Paso Wastewater Purification Facility Breaks Ground

As water supplies become strained and technology advances, cities look to wastewater as a viable source of drinking water.

1 hour ago - Governing

General Store and Post Office in Saint Michael North Dakota on the Spirit Lake Reservation.

Spirit Lake Nation Reclaims 680 Acres After Century-Long Effort

After decades of advocacy, the Spirit Lake Nation successfully reclaimed 680 acres of its original treaty land from the U.S. Fish and Wildlife Service, marking a significant step toward healing and future development.

2 hours ago - ICT

Urban Design for Planners 1: Software Tools

This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.

Planning for Universal Design

Learn the tools for implementing Universal Design in planning regulations.