That's the name of the new project being built in the Beijing Watercube, one of the city's highlight architectural creations built for the 2008 Summer Olympics.
The site of Olympic swimming competitions during the 2008 event was pre-planned to host an amusement park after the games. Plans will include a waterslide park and entertainment destination. It remains unclear when the park will open.
"The redesign is by Canadian firm Forrec, internationally known for theme parks, water parks, and other venues. Forrec is one of several top industry suppliers and consultants weighing in on the project, including Australian waterpark veteran Alan Mahony. The design features top-notch and even some "first-ever" attractions, notably the RideHouse play structure, by industry leader ProSlide Technology. This structure will accompany China's first AquaLoop looping waterslide, by WhiteWater West; a water Tornado; tube slides, body slides; lazy river, wave pool, and other attractions. Additionally, more than one-third of the over 100,000-sq.-ft. Watercube was pre-planned for conversion into a recreational waterpark at the time of its original construction."
FULL STORY: Checking In: Beijing Water Cube Water Park Project

Study: Maui’s Plan to Convert Vacation Rentals to Long-Term Housing Could Cause Nearly $1 Billion Economic Loss
The plan would reduce visitor accommodation by 25,% resulting in 1,900 jobs lost.

North Texas Transit Leaders Tout Benefits of TOD for Growing Region
At a summit focused on transit-oriented development, policymakers discussed how North Texas’ expanded light rail system can serve as a tool for economic growth.

Why Should We Subsidize Public Transportation?
Many public transit agencies face financial stress due to rising costs, declining fare revenue, and declining subsidies. Transit advocates must provide a strong business case for increasing public transit funding.

How to Make US Trains Faster
Changes to boarding platforms and a switch to electric trains could improve U.S. passenger rail service without the added cost of high-speed rail.

Columbia’s Revitalized ‘Loop’ Is a Hub for Local Entrepreneurs
A focus on small businesses is helping a commercial corridor in Columbia, Missouri thrive.

Invasive Insect Threatens Minnesota’s Ash Forests
The Emerald Ash Borer is a rapidly spreading invasive pest threatening Minnesota’s ash trees, and homeowners are encouraged to plant diverse replacement species, avoid moving ash firewood, and monitor for signs of infestation.
Urban Design for Planners 1: Software Tools
This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.
Planning for Universal Design
Learn the tools for implementing Universal Design in planning regulations.
City of Santa Clarita
Ascent Environmental
Institute for Housing and Urban Development Studies (IHS)
City of Grandview
Harvard GSD Executive Education
Toledo-Lucas County Plan Commissions
Salt Lake City
NYU Wagner Graduate School of Public Service